国产精品一久久香蕉产线看-国产精品一区在线播放-国产精品自线在线播放-国产毛片久久国产-一级视频在线-一级视频在线观看免费

英語六級閱讀答案

時間:2022-06-25 08:14:23 行業 我要投稿
  • 相關推薦

英語六級閱讀答案

  英語六級閱讀答案

  In the last two hundred years there have been great changes in the method of production of goods. This is now also true of the building industry; for mechanization has been introduced. System building can save both time and money. The principle of system building is that the building is made from a set of standard units. These are either made at the building-site or at a factory. Some designers, in fact, are standardizing the dimensions of rooms. They are made in multiples of a single fixed length, usually ten centimeters. This is called a modular (標準件的) system, and it means that manufactures can produce standardized fittings at a lower cost. The most important fact about system building is its speed. A ten-storey flat, for example, can be completed in four months.

英語六級閱讀答案

  There are several new methods of system building. One is the panel method. In this case, the construction company sometimes erects a factory on the site. The walls and floors of the building, called panels, are cast in a horizontal or vertical position. Conduits for electrical wires and sleeves for pipes are cast in the panels when they are being made. The moulds for making these castings are situated all around the building.

  After the concrete panels are cast, they are allowed to set and harden for a week. Next they are lifted by a tower crane on to any section of the building. There the panels are cemented together at their joints and the floor covering is laid.

  After the panels have been cemented together, the crane lifts a case into the area. It contains all the fittings to be installed, such as wash-basins, radiators and pipes. Finishing tradesmen, such as plumbers, plasterers, painters and electricians, follow behind to complete the work.


  In some building developments, in some countries, whole flats with internal features like their bathrooms, bedrooms and connecting stairs, and weighing as much as twenty tons, are carried to the building-site ready-made. A giant overhead crane is used to lift them into position. In the future, this method may become more widespread.

  1. The main difference between panel method and the method discussed in the last paragraph is_______.

  A. the latter uses ready-made internal features

  B. panels are cast in a level position

  C. the former is used to build walls and floors while the latter to construct bathrooms or bedrooms

  D. the former is more expensive than the latter

  2. Which of these statements is TRUE of system building?

  A. It employs more men. B. It is difficult and dangerous.

  C. It can save both time and money. D. It means less mechanization.

  3. According to the passage, the principle of system building is that_______.

  A. construction methods are safer

  B. buildings are made from a set of standardized units

  C. similar buildings can be produced

  D. all units are produced on the site

  4. The usual fixed length in the modular system is_______.

  A. twenty centimeters B. ten millimeters

  C. fifty centimeters D. ten centimeters

  5. What lifts the concrete panels onto the building?

  A. Cranes. B. Man-power.

  C. Pulleys. D. Hydraulic jacks.

  參考答案: 1. A 2. C 3. B 4. D 5. A

【英語六級閱讀答案】相關文章:

《說說“淺閱讀”》閱讀答案07-04

《匆匆》閱讀答案07-02

《圓滿》閱讀答案07-03

山民 閱讀答案07-02

春酒閱讀答案07-03

春卷閱讀答案07-03

宣紙閱讀答案07-03

社戲閱讀答案07-03

秋思閱讀答案07-03

南轅北轍閱讀答案07-03

主站蜘蛛池模板: 一级毛片短视频 | 日韩成人免费视频播放 | 激情五月网站 | 午夜湿影院多多影院 | 天天艹天天操 | 欧美性精品人妖 | 久久精品视 | 日韩美女影院 | 免费看黄色片网站 | 一级做a爱片久久蜜桃 | 欧美成人香蕉网在线观看 | 伊人网大香 | vk挠脚心tk| 成年视频国产免费观看 | 热热涩热热狠狠色香蕉综合 | 黄色一级a毛片 | www视频免费 | 九九这里只精品视在线99 | 中文字幕在线免费播放 | 国产成人精品免费视频大全麻豆 | 国产成人精品aaaa视频一区 | 成人黄色一级毛片 | 天天操夜夜做 | 在线欧美a | 1024人成软件色www | avtt天堂网手机版亚洲 | 爆操欧美美女 | 欧美日韩中文字幕一区二区高清 | 18成禁人视频免费 | 可以在线看黄的网站 | 91视频大全| 欧美一区二区三区香蕉视 | 中文字幕欧美日韩一 | 精品视频99| 一区二区三区日韩精品 | 国产成人亚洲精品影院 | 欧美性猛交ⅹxxx乱大交按摩 | 一本大道在线观看 | 欧美成人免费全部观看天天性色 | 国产日韩欧美在线观看不卡 | 免费黄篇|